Curatorial activities. Archevolution, hardscapes in world, world Interior designer, world exterior designer
15:34 Haarchitect 0 Comments
From 21.04.2013 on 27.04.2013 died down international forum of students architects,, Archevolution2013 "in Brest, where I was a curator.
Links to forum:
http://archevolution2013.blogspot.com/
http://www.slideshare.net/ArchEvolution
http://www.youtube.com/channel/UC1dypheQPsuXAxonyftYPEA
I'm right on top =) This photo was taken by Alexei Starkov.
On Archevolution:
On an international expert seminar:
To begin with, we were given a zero room in which was a pile of garbage and lay cm layer of dust, in which we were suffocating are cleaned before the forum. Oh well ... It should be noted that the entire room was prepared with 3 people + -4 man.
The main thing that we all had the time and do some furniture, spent wiring, Primed floor, dragged all the equipment and the rest of the furniture.
And it all started - flashed (for me) and ended. Employment was the clock! In order to have time to do all the work in time I'm just a period of transition from a normal step in running =). Next photo:
Alexei Kanonenko with his group:
+48 with group:
Group Georgij Zaborskij:
Artem KItaev and his group:
Nikholai Palazhchenko like guest:
More photo in group VK: Want more PHOTO
Links to forum:
http://archevolution2013.blogspot.com/
http://www.slideshare.net/ArchEvolution
http://www.youtube.com/channel/UC1dypheQPsuXAxonyftYPEA
I'm right on top =) This photo was taken by Alexei Starkov.
On Archevolution:
On an international expert seminar:
To begin with, we were given a zero room in which was a pile of garbage and lay cm layer of dust, in which we were suffocating are cleaned before the forum. Oh well ... It should be noted that the entire room was prepared with 3 people + -4 man.
The main thing that we all had the time and do some furniture, spent wiring, Primed floor, dragged all the equipment and the rest of the furniture.
And it all started - flashed (for me) and ended. Employment was the clock! In order to have time to do all the work in time I'm just a period of transition from a normal step in running =). Next photo:
Alexei Kanonenko with his group:
+48 with group:
Karli Luik with group:
Group Anton Veremenjuk:
Group Mihail Stepura:
Group Vera Sisoeva:
Group Georgij Zaborskij:
Artem KItaev and his group:
Nikholai Palazhchenko like guest:
More photo in group VK: Want more PHOTO
Meeting with Dieter Bogner, hardscapes in world, world Interior designer, world exterior designer
07:04 Haarchitect 0 Comments
international competition Isover, world Interior designer, world exterior designer
09:59 Haarchitect 0 Comments
Подписаться на:
Сообщения (Atom)
Popular Posts
-
Concept: HAArchitect Visualization: HAArchitect Cozy and ongoing dialogue with the environment project basin stretched around a pictu...
-
Architects: Kobak Ellina, Hrabliuk Alexsandr The facade of the main case of university became obsolete long ago. The educational institu...
-
Diz: Martinov M. Viz: Haarchitect As for us there is a feeling of denim, liberty and the student-time =)
Технологии Blogger.
Архив блога
-
▼
2013
(23)
-
▼
июня
(13)
- visualization exterior, hardscapes in world, world...
- Curatorial activities. Archevolution, hardscapes i...
- Meeting with Dieter Bogner, hardscapes in world, w...
- visualization exterior, hardscapes in world, world...
- Interior visualization,world Interior designer, wo...
- bathroom interior, world Interior designer, world ...
- The school with the architectural direction of tra...
- Exterior and interior of the hotel for 300 people,...
- Exterior and interior auto service station with th...
- Hardscape viz, world Interior designer, world exte...
- Interior, world Interior designer, world exterior ...
- international competition Isover, world Interior d...
- Landscape Sculpture,world Interior designer, world...
-
▼
июня
(13)
0 коммент.: