Visualization of the shopping center, hardscapes in world, world Interior designer, world exterior designer

07:39 Haarchitect 0 Comments

Architecture: Кобак Эллина
Viz : Haarchitect
The project is a multifunctional shopping and entertainment center in Brest includes: arts and crafts center, a branch center,, Copernicus ", operated an extensive terrace, a water park, race track for radio-controlled models, air hockey field, panoramic cinema, rental space, a supermarket, a furniture store and two cats (alive).



0 коммент.:

Reconstruction of an industrial building in the Catholic Church, hardscapes in world, world Interior designer, world exterior designer

10:30 Haarchitect 0 Comments

Project: Haarchitect

Visualization: Haarchitect

Still can not get the time to put this work, as well as a holiday today - we have a bit of time and in the subject falls.

All Catholics with the holiday!


Minimalist, brutal facade typical of the modern city

Administrative building 48h18 m is in the city of Brest. The facades are made of hinged panels, column spacing 6, 3m. The reasons for the reconstruction of the building:
1. Transfer of an industrial complex outside the city limits and the need to give a new function adjacent residential industrial areas.
2. The physical condition of the building (nodes abutting slabs and columns come in a constructive disrepair).
3. obsolescence facade, structure planning, neighborhood.
4. The need for more cultural and serving the district
5. Chill in the premises in connection with the changing norms of heat engineering buildings.
A version of the reconstruction of the ABA in the modern Catholic Church. The project foresees the accomplishment of adjoining territory belfry, new coatings, landscaping, parking.
The building of the Catholic cathedral there are additional rooms on the second floor for the wedding choirs on the second floor, the space at the entrance to the function of communication and expectations. On the basis of the Cathedral will act Catholic Sunday school with teachers, classrooms and a library.
The central core of ABA replace a large column-free space in the center. Old wall is dismantled and erected new with ligation of metal columns with a diameter of 15 cm from the load bearing coffered ceiling and at the same time invisible from the street, which creates the illusion of bigger overlap hovering in the air.

Instead of old windows installed new with the individual composition.
In coffered ceilings create skylight creates additional lighting in the area of the altar. The lantern is with careful calculation that holiday December 25 starting from the morning until 12:00 light round spot will move from the corner of the wall to the altar creating sacred experiences of the congregation.



Noon in the church. The light spot is right on the altar.
The central symbol of the altar is a modern pastiche of the cross in the volumetric composition highlighted below.

0 коммент.: